Skip to content

Commit 478b73f

Browse files
committed
adds audit m5 content and fixes m3 link
1 parent 93f98a9 commit 478b73f

2 files changed

Lines changed: 41 additions & 3 deletions

File tree

docs/project-catalyst/f12-audit.md

Lines changed: 41 additions & 3 deletions
Original file line numberDiff line numberDiff line change
@@ -237,7 +237,7 @@ Batch one requirements can be found below.
237237

238238
<!-- markdownlint-disable MD013 -->
239239

240-
<iframe src="https://docs.google.com/spreadsheets/d/1Vdh2nhreVkGP570KCTfuBhWaAzFnWzjg/preview" width="640" height="480" allow="autoplay"></iframe>
240+
<iframe src="https://docs.google.com/spreadsheets/d/1CXx4XSN7NZbZIK6D4_YGVmL2RawXtYhU/preview" width="640" height="480" allow="autoplay"></iframe>
241241

242242
<!-- markdownlint-enable MD013 -->
243243

@@ -288,7 +288,45 @@ in Milestone 2.
288288

289289
## Milestone 5
290290

291-
A final report containing auditor findings, recommendations, and summary of
292-
Orcfax team remediation actions in response to audit.
291+
With the acceptance of material relating to the off-chain audit, both Orcfax
292+
audits have now concluded successfully. The following constitutes the feedback
293+
received and the Orcfax strategy for addressing auditor feedback/additional
294+
requests.
295+
296+
### M5 On-chain
297+
298+
TxPipe provided their final report in milestone three; this portion of the
299+
Orcfax audit is complete.
300+
301+
### M5 Off-chain
302+
303+
In accordance with the delivery schedule outlined in milestone 2, Orcfax has
304+
incrementally provided BlinkLabs with the requested materials for audit. Since
305+
the last milestone, Orcfax has provided the third and final batch of records to
306+
demonstrate infrastructure adherence to SOC2 standards.
307+
308+
Batch three requirements can be found below.
309+
310+
<!-- markdownlint-disable MD013 -->
311+
312+
<iframe src="https://docs.google.com/spreadsheets/d/13sJQS_VMXQHc_kVseEEMFYv3xks7-aMw/preview" width="640" height="480" allow="autoplay"></iframe>
313+
314+
<!-- markdownlint-enable MD013 -->
315+
316+
Each of these has been accepted by BlinkLabs as satisfactory, and a letter
317+
evidencing final batch completion was provided by their staff. The letter
318+
includes notes where BlinkLabs requested, and received, additional evidence to
319+
meet specific requirements within the batch.
320+
321+
![BlinkLabs Confirmation](/img/2026-02-19--batch-3-audit-progress.png)
322+
323+
Additionally, this work culminated in a system description as required under
324+
ReqID 2990.
325+
326+
<!-- markdownlint-disable MD013 -->
327+
328+
<iframe src="https://docs.google.com/document/d/1Oghee9S1iX_3eo2ZTtO62wJ-lNN6v0R9w7Ke7Oa-i1U/preview" width="640" height="480" allow="autoplay"></iframe>
329+
330+
<!-- markdownlint-enable MD013 -->
293331

294332
## Final Milestone
262 KB
Loading

0 commit comments

Comments
 (0)