Check pt tree sitter upgrade and additional language support. #79
ci.yml
on: push
Build Release
2m 15s
Security Audit
2m 48s
Matrix: Test Suite
Annotations
11 errors
|
Test Suite (ubuntu-latest, stable)
Process completed with exit code 1.
|
|
Test Suite (macos-latest, stable)
Process completed with exit code 1.
|
|
Test Suite (macos-latest, stable)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed
|
|
Test Suite (macos-latest, beta)
The operation was canceled.
|
|
Test Suite (macos-latest, beta)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed
|
|
Test Suite (windows-latest, stable)
The operation was canceled.
|
|
Test Suite (windows-latest, stable)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed
|
|
Test Suite (windows-latest, beta)
The operation was canceled.
|
|
Test Suite (windows-latest, beta)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed
|
|
Test Suite (ubuntu-latest, beta)
The operation was canceled.
|
|
Test Suite (ubuntu-latest, beta)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
smart-diff-cli-linux
Expired
|
3.23 MB |
sha256:43e8390eb17fbfc986a9a7b097dfb1b1ef3691d083d07514344c2d739e3e462e
|
|
|
smart-diff-server-linux
Expired
|
3.6 MB |
sha256:b204846c58624fcec72a835e1e58e2657ac221609313b34f58c2df1d23769c54
|
|