Skip to content

Check pt tree sitter upgrade and additional language support. #79

Check pt tree sitter upgrade and additional language support.

Check pt tree sitter upgrade and additional language support. #79

Triggered via push October 15, 2025 14:25
Status Failure
Total duration 2m 51s
Artifacts 2

ci.yml

on: push
Matrix: Test Suite
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Test Suite (ubuntu-latest, stable)
Process completed with exit code 1.
Test Suite (macos-latest, stable)
Process completed with exit code 1.
Test Suite (macos-latest, stable)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed
Test Suite (macos-latest, beta)
The operation was canceled.
Test Suite (macos-latest, beta)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed
Test Suite (windows-latest, stable)
The operation was canceled.
Test Suite (windows-latest, stable)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed
Test Suite (windows-latest, beta)
The operation was canceled.
Test Suite (windows-latest, beta)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed
Test Suite (ubuntu-latest, beta)
The operation was canceled.
Test Suite (ubuntu-latest, beta)
The strategy configuration was canceled because "test.ubuntu-latest_stable" failed

Artifacts

Produced during runtime
Name Size Digest
smart-diff-cli-linux Expired
3.23 MB
sha256:43e8390eb17fbfc986a9a7b097dfb1b1ef3691d083d07514344c2d739e3e462e
smart-diff-server-linux Expired
3.6 MB
sha256:b204846c58624fcec72a835e1e58e2657ac221609313b34f58c2df1d23769c54